Waterways Commission |
|
|
|
| |
Capital Outlay Plan
FY11-FY17 |
|
|
|
| |
FY11 |
FY12 |
FY13 |
FY14 |
FY 15 |
FY 16 |
FY 17 |
FY 17 |
FY 18 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Harbor Planning Article |
|
|
|
|
| 1. Saquatucket Harbor |
|
|
|
|
|
| a. North bulkhead (plus west ramp) 584' |
|
|
|
|
|
|
|
| i. Maintenance |
|
|
|
$200,000 |
|
|
|
|
| ii. Replacement |
|
|
|
|
$1,500,000 |
|
|
|
| b. East bulkhead (old fuel
dock & east side ramp) 242' |
|
|
|
|
|
|
|
| iii. Replacement |
|
|
|
|
|
$700,200 |
|
|
|
| iv. Pilings |
|
|
|
|
|
| 3. Steel remaining 24 |
|
|
|
|
|
| 1. Floats |
|
|
|
|
$275,000 |
|
|
|
| vii. Downey property
(adjacent to marina) |
|
$1,250,000 |
|
|
|
|
|
| 1. Rack storage for smaller
boats |
|
|
|
|
|
| 2. Increase parking |
|
$200,000 |
|
|
|
|
|
| xii. Bank street
harbormaster workshop |
|
|
|
|
| 2. Move workshop to Downey
property |
|
|
|
|
| Channel to tip of jetties |
|
|
|
|
| Dredging inner Channel &
marina |
|
|
|
|
$2,000,000 |
|
|
| viii. Outer channel |
|
|
|
|
|
| 1. Dredging (7,000 cu yds beach sand long haul) |
$77,000 |
|
|
|
$90,000 |
|
|
|
|
| 2. Allen Harbor |
|
|
|
|
|
| a. Inner basin |
|
|
|
|
|
| i. Bulkhead-new south facing
blkhd |
|
$260,000 |
|
|
|
|
| ii. Pilings/docks |
|
|
|
|
|
| v. Dredging |
|
$92,000 |
|
|
|
|
|
| vi. Parking Lot |
|
|
$100,000 |
|
|
|
|
|
| b. Jetty Area-from tip to
where rock ends |
|
|
|
$1,200,000 |
|
|
| c. Outer channel |
|
|
|
|
|
| i. Dredging (8,000
cu.yds beach sand long haul) |
$88,000 |
|
$60,000 |
|
$90,000 |
|
$70,000 |
|
$70,000 |
|
|
| d. Inner basin to jetty
(inner end) |
|
|
|
|
|
| i. Dredging (40,000 cu yds of sludge) |
|
$2,500,000 |
|
|
|
|
|
| 3. Wychmere Inner Harbor |
|
|
|
|
|
| a. Channel from Outer to
Inner Harbors |
|
|
|
|
|
|
|
| i. Dredge |
|
|
$40,000 |
|
|
$40,000 |
|
|
|
|
| b. Basin |
|
|
|
|
|
| i. Dredge |
|
|
|
|
$2,500,000 |
|
|
|
| Town Dock |
|
|
|
|
|
| ii. Paving, storm treat
removal & basin installation |
|
$167,307 |
|
|
|
|
|
| iii. East side |
|
|
|
|
|
| 1. Extend bulkhead towards
restrooms????????? |
|
|
|
|
|
|
|
| 2. Replace Restrooms |
|
$50,000 |
|
|
|
|
|
| 4. Wychmere Outer Harbor |
|
|
|
|
|
| 1. Needs raising to be a
“Harbor of Refuge” |
|
|
|
|
|
|
|
| 2. Entrance Light-West Jetty |
|
|
|
|
|
| 1. Lengthen |
|
|
|
|
|
|
| v. Basin |
|
|
|
|
|
| 1. Dredge |
|
|
|
160000 |
|
|
|
|
| a. More moorings possible |
|
|
|
|
|
|
| 2. Deepen |
|
|
|
|
|
|
| 5. Round Cove |
|
|
|
|
|
| a. Opening from Pleasant Bay |
|
|
|
|
|
| i. Dredging |
$35,000 |
|
$35,000 |
|
$35,000 |
|
|
|
| b. Basin |
|
|
|
|
|
| i. Dredging |
|
|
|
|
|
|
|
| i. Non-buildable lot |
|
|
|
|
|
| ii. Expanded parking |
|
|
|
|
|
|
|
| f. Ramp |
|
|
|
|
|
|
|
|
| h. Bulkhead |
|
|
|
$300,000 |
|
|
|
|
| 6. Herring River |
|
|
|
|
|
| i. Dredging |
|
$50,000 |
|
|
|
|
|
| Replace Wixon Dock |
|
$45,000 |
|
|
|
|
|
| ii. Pave ramp |
|
|
|
|
|
|
| 7. Town Ramp-Rt 28 |
|
|
|
|
|
| Paved Ramp |
|
$100,000 |
|
|
|
|
| TOTAL BY YEAR |
$200,000 |
$4,012,307 |
$542,000 |
$295,000 |
$680,000 |
$475,000 |
$4,105,000 |
$700,200 |
$3,270,000 |
|
|
| |
|
|
|
|
|
| |
|
|
|
|
| |
SHORT ITEMS |
|
|
|
|
| |
|
|
|
|
|
| |
FY11 |
FY12 |
FY13 |
FY14 |
FY 15 |
FY 16 |
|
|
| Saquatucket Harbor |
|
|
|
|
|
|
|
|
| Washdown system |
|
$35,000 |
|
|
|
| East Bulkhead (old fuel dock)
maintenance |
|
|
|
|
| Electric/water towers |
|
|
$50,000 |
|
|
| Allen Harbor |
|
|
|
|
| Rest Rooms |
|
$50,000 |
|
|
|
| Replacement of jettty light |
|
$15,000 |
|
|
|
|
| Wychmere |
|
|
$15,000 |
|
|
| Replace Dingy Dock |
|
|
|
|
| Fuel Dock fill and expand
parking |
|
|
|
|
| Needs raising outer Harbor
beakwater |
|
|
|
|
|
| Round Cove |
|
|
|
| Replace dock/float |
|
$35,000 |
|
|
| TOTAL BY YEAR |
$0 |
$0 |
$15,000 |
$50,000 |
$35,000 |
$65,000 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|